MIL-P-53108(ME)
to verify the functional operation of the automatic controls. The pump shall be examined during the operation for leakage through the pump casing or the shaft seals and for malfunction of any component. Any leakage attributable to defects in design, workmanship, materials, or to the malfunction of any component or inability of the pump to deliver the minimum capacities specified herein shall constitute failure of this test.
4.6.2.4 Tilted position. The pump unit shall be operated for not less than 30 minutes while it is positioned 5 degrees from level along the longitudinal centerline of the engine. Evidence of malfunction or misalignment of components shall constitute failure of this test.
4.6.2.5 Environmental tests. The pump unit shall be tested in accordance with
MIL-STD-810 for the following:
a. Method 501.3, high temperature, procedure II. Maximum nonoperating temperature is 155 F. Maximum operating temperature is 135 F.
b. Method 502.3, low temperature, procedure I. Minimum nonoperating temperature is
-60 F. Minimum operating temperature is -25 F.
c. Method 500.3, low pressure (altitude), procedure II. Maximum operating temperature of 100 F at 6000 feet altitude.
A waiver of this test will be permitted when the contractor supplies certification that the pump unit is capable of operating in the specified environmental conditions. If certification of performance is provided and accepted, the contractor will provide a warranty to correct any malfunctions caused by operating in the conditions specified in 3.6.
4.6.2.6 Safety. The pump unit shall be evaluated for safety requirements throughout testing as specified in 4.6.2. Nonconformance to 3.7 shall constitute failure of this test.
4.6.2.7 Human factors engineering inspection. The human factors engineering characteristics shall be inspected during testing. Nonconformance to 3.8 shall constitute failure of this test.
4.6.2.8 Noise level test. Noise levels shall be measured in accordance with MIL-STD-1474,
5.1 requirements and reported in the format indicated by MIL-STD-1474, figure 7. As a minimum: noise levels shall be measured when equipment is operating under full load;
MIL-STD-1474, 5.1.2.1.4 contours shall be taken at not fewer than 12 equal arc increments, one increment shall include data from the noisiest position. Additionally, the noise level at the
typical operating position shall be provided as dB(A) level. Failure to comply with 3.9 and
MIL-STD-1474 provisions shall constitute failure of this test.
4.6.2.9 Electromagnetic interference. The pump unit shall be tested to determine conformance with 3.24. Nonconformance to 3.24 shall constitute failure of this test.
4.6.2.10 Transportability tests.
4.6.2.10.1 Tiedown provisions. The tiedown provisions shall be tested in accordance with MIL-STD-209 to prove conformance to 3.17.1. Inability to meet the requirements of 3.17.1 shall constitute failure of this demonstration.
18
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business