MIL-P-53065(ME)
5.2.1 Level A and B. Levels A and B packaging, which includes preservation,
packing and marking, shall be in accordance with the applicable provisions for
levels A and B of MIL-P-10603.
5.2.2 Commercial. Commercial packaging, which includes preservation, packing
and marking, shall be in accordance with ASTM D 3951. Additionally, each
shipping container, as applicable, shall be marked with the gross weight and
cube.
5.3 Depreservation guide. Two depreservation guides shall be prepared. One
guide shall be placed in a waterproof envelope marked "Depreservation Guide" and
shall be secured to the pump unit in a conspicuous location. The second guide
shall be preserved with the technical publications and the bag shall be marked
to indicate that the depreservation guide is inside, Unless otherwise specified
(see 6.2), DA Form 2258, "Depreservation Guide for Vehicles and Equipment",
shall be used.
NOTES
6.
6.1 Intended use. The pumping units will be used to transfer fuel from
disabled vehicles, under and above ground storage tanks and tank trucks. The
unit will operate under severe conditions such as explosion shock, dust and
severe climatic elements.
Procurement documents should specify the following:
Ordering data.
6.2
Title, number, and date of this specification.
a.
b.
When a first article is required for the first article inspection and
approval (see 3.2, 4.3, and 6.3).
When electromagnetic interference suppression is not required (see
c.
3.16).
d.
Color of finish coat if not as specified (see 3.17).
e.
Time frame required for submission of the first article pack (see
5.1).
When first article packaging is not required (see 5.1).
f.
Degree of packaging required (see 5.2).
g.
When other than DA Form 2258 shall be used (see 5.3).
h.
6.3 First article. When a first article inspection is required, the items
should be a preproduction model. The first article should consist of one unit.
The contracting officer should include specific instructions in acquisition
documents regarding arrangements for examinations, tests, and approval of the
first article test results and disposition of the first article.
production packs from
6.4 First article pack. Any changes or deviations of
approval of the
the approved first article pack will be subjected to the
will not relieve the
contracting officer. Approval of the first article pack
the pumping unit in
contractor of his obligation to preserve, pack, and mark
accordance with this specification.
14
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business