4.7.1 Inspection failure. Failure of an inspection comparison pumping unit
to meet any requirement specified herein, during and as a result of the
examination and tests specified in 4.6, shall be cause for rejection of the
inspection comparison pumping unit and shall be cause for refusal by the
Government to continue acceptance of production pumping units until evidence has
been provided by the contractor that corrective action has been taken to
eliminate the deficiencies. Correction of such deficiencies shall be
accomplished by the contractor at no cost to the Government on pumping units
previously accepted and produced under the contract. Any deficiencies found as
a result of the inspection comparison will be considered prima facie evidence
that all pumping units accepted prior to the completion of the inspection
comparison are similarly deficient, unless evidence to the contrary is furnished
by the contractor and such evidence is acceptable to the contracting officer.
4.8 Inspection of packaging.
4.8.1 First article inspection of packaging. The first article packaging
shall be examined and tested in accordance with the first article pack
(reproduction pack) inspection provisions of MIL-P-10603, and for the
additional examination defects specified in 4.8.2.1.
4.8.2 Quality conformance inspection. Packaging of pump assemblies shall be
examined in accordance with the quality conformance inspection provisions of
MIL-P-10603, and for the additional examination defects specified in 4.8.2.1.
4.8.2.1 Examination. Sample packs, selected in accordance with the sampling
requirements of MIL-P-10603, shall be examined for the following defects, in
addition to the defects listed in MIL-P-10603. The AQL shall be as specified
therein.
Major
Commercial packaging not as specified.
131.
5.
PACKAGING
5.1 First article packaging. Unless otherwise specified (see 6.2), the
contractor shall furnish a first article pack for examination and testing within
the time frame specified (see 6.2), to prove prior to the start of production
packaging, that the applied preservation, packing, and marking comply with the
requirements of this specification. Examination and testing shall be as
specified in section 4 and shall be subject to surveillance and approval by the
Government (see 6.4). The first article pack may utilize either the first
article model or a production model. When the first article model is utilized,
and the Government requests a comparison between the first article model and a
production model, any preservation and packing shall be removed by the
contractor at no expense to the Government.
5.2 Packaging. Packaging of the pumping units shall be level A, level B or
commercial as specified (see 6.2).