MIL-P-14514G
6.
NOTES
6.1 Intended use. The pumps covered by this specification are intended for
general purpose use in water purification equipment.
6.2 Ordering data.
6.2.1 Acquisition requirements.
Acquisition documents should specify the
following:
Title, number, and date of this specification.
a.
b.
Type of pump required (see 1.2).
c.
Date of issue of DoDISS applicable and exceptions thereto (see 2.1.1).
d.
When a first article is not required (see 3.2).
e.
Time frame required for submission of first article model and number of
pumps required (see 3.2).
f.
When the Government will conduct any or all of the first article
examination and tests, the contracting officer should specify which
examination and tests will be conducted by the Government and which
examination and tests shall be conducted by the contractor (see 3.2).
Color required if other than specified (see 3.17).
g.
h.
Degree of preservation and packing required (see 5.1 and 5.2).
When other than DA Form 2258 shall be used (see 5.4).
i.
6.3 First article. When a first article inspection is required, the item
should be a preproduction model.
The first article should consist of one unit.
The contracting officer should include specific instructions in the acquisition
documents regarding arrangements for examinations tests and approval of the
first article test results and disposition of the first article.
6.4 Lubricants. MIL-STE838 Lubrication of Military Equipment, prescribes
the policy for using specification-type products wherever possible and provides
specific requirements for potential use of non-standard proprietary products.
HIL-STD-838 is implemented by MIL-HDBK-113 Guide for the Selection of
Lubricants, Fluids, Preservatives and Speciality Products for Use in Ground
Equipment Systems. The contracting officer should note that unless otherwise
authorized by the US Army Belvoir Research, Development and Engineering Center
STRBE-VF), Fort Belvoir, VA 22060-5606, lubricants, fluids, and greases
(ATTN:
for ground equipment systems must be restricted to those listed under
MIL-HDBK-113, chapter 2.
The contracting officer should arrange to furnish
6.5 Depreservation guides.
the necessary copies of M Form 2258, when requested by the contractor (see 5.4).
6.6 Subject term (key word) listing.
Pumping
assembly,
diesel engine driven.
Pumping
assembly,
electric motor driven.
Pumping
assembly,
water.
65 GPM, centrifugal.
Pumping
assembly,
15
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business