MIL-P-17574D(YD)
3.15.2 Riveted connections. Rivet holes shall be accurately punched or
drilled and shall have the burrs removed. Rivets shall be driven with pressure
tools and shall completely fill the holes. Rivet heads, when not countersunk or
flattened, shall be of approved shape and of uniform size for the same diameter
of rivet. Rivet heads shall be full, neatly made, concentric with the rivet
holes, and in full contact with the surface of the member.
3.15.3 Bolted connections. Bolt holes shall be accurately punched or
drilled and shall have the burrs removed. Washers or lockwashers shall be
provided in accordance with good commercial practice, and all bolts, nuts, and
screws shall be tight.
3.15.4 Castings. All castings shall be sound and free from patching,
misplaced coring, warping, or any other defect which reduces the casting ability
to perform its intended function.
3.15.5 Welding. Welding procedures shall be in accordance with a nationally
recognized welding code. The surface of parts to be welded shall be free from
rust, scale, paint, grease, or other foreign matter. Welds shall be of
sufficient size and shape to develop the full strength of the parts connected by
the welds. Welds shall transmit stress without permanent deformation or failure
when the parts connected by the weld are subjected to proof and service
loadings.
4.
QUALITY ASSURANCE PROVISIONS
4.1 Responsibility for inspection. Unless otherwise specified in the
contract or purchase order, the contractor is responsible for the performance of
all inspection requirements as specified herein. Except as otherwise specified
in the contract or purchase order, the contractor may use his own or any other
facilities suitable for the performance of the inspection requirements specified
herein, unless disapproved by the Government. The Government reserves the right
to perform any of the inspections set forth in the specification where such
inspections are deemed necessary to assure supplies and services conform to
prescribed requirements.
4.1.1 Responsibility for compliance. All items shall meet all requirements
of section 3 and 5. The inspection set forth in this specification shall become
a part of the contractor's overall inspection system or quality program. The
absence of any inspection requirements in the specification shall not relieve
the contractor of the responsibility of assuring that all products or supplies
submitted to the Government for acceptance comply with all requirements of the
contract, Sampling in quality conformance does not authorize submission of
known defective material, either indicated or actual, nor does it commit the
Government to acceptance of defective material.
4.1.2 Component and material inspection. Components and materials shall be
inspected in accordance with all the requirements specified herein and in
applicable referenced documents.
9
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business