MIL-W-28517B(YD)
All castings shall be sound and free from patching,
3.16.4 Castings.
misplaced coring, warping, or any other defect which reduces the castings
ability to perform its intended function.
3.16.5 Welding. Welding procedures shall be in accordance with a nationally
The surface of parts to be welded shall be free from
recognized welding code.
Welds shall be of
rust, scale , paint, grease, or other foreign matter.
sufficient size and shape to develop the full strength of the parts connected by
Welds shall transmit stress without permanent deformation or failure
the welds.
when the parts connected by the weld are subjected to proof and service
loadings.
QUALITY ASSURANCE PROVISIONS
4.
4.1 Responsibility for inspection.Unless otherwise specified In the
contract or purchase order, the contractor is responsible for the performance of
all inspection requirements (examinations and tests) as specified herein. Except
as otherwise specified in the contract or purchase order, the contractor may use
his own or any other facilities suitable for the performance of the inspection
requirements specified herein, unless disapproved by the Government. The
Government reserves the right to perform any of the inspections set forth in
this document where such inspections are deemed necessary to ensure supplies and
services conform to prescribed requirements.
All items shall meet all requirements
4.1.1 Respo nsibility for compliance.
The inspections set forth in this document shall become a
of sections 3 and 5.
part of the contractor's overall inspection system or quality program. The
absence of any inspection requirements in this document shall not relieve the
contractor of the responsibility of ensuring that all products or supplies
submitted to the Government for acceptance comply with all requirements of the
Sampling inspection, as part of manufacturing operations, is an
contract.
acceptable practice to ascertain conformance to requirements, however, this does
not authorize submission of known defective material, either indicated or
actual, nor does it commit the Government to accept defective material.
Components and materials shall be
4.1.2 Comp onent and material inspection.
inspected in accordance with all the requirements specified herein and in
applicable referenced documents.
The inspection requirements specified
4.2 Classification of inspections.
herein are classified as follows:
First article inspection (see 4.2.1).
Quality conformance inspection (see 4.2.2).
The first article inspection shall be
4.2.1 First article inspection.
performed on one complete automatic water supply system when a first article is
This inspection shall include the examination of
required (see 3.2 and 6.2).
4.4, the tests of 4.5 and when specified (see 6.2), the packaging inspection of
4.6.
The first article may be either a first production item or a standard
production item from the supplier's current inventory provided the item meets
the requirements of the specification and is representative of the design,
construction, and manufacturing technique applicable to the remaining items to
be furnished under the contract.
7
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business