MIL-PRF-62495B(AT)
3.5 Finish. All exposed ferrous and aluminum surfaces shall be cleaned, treated, primed
and finished (see 4.6.2). The film thickness of the primer shall be not less than 1 mil. The dry film
thickness of the coating shall be not less than 1 mil. The color shall match color chip number
24533 (green) of FED-STD-595.
3.6 Marking. The power unit shall be marked in accordance with the manufacture
practice (see 4.6.2).
3.7 Workmanship. Workmanship shall be such as to provide a power unit free from
defects such as cracked, dented, loose, broken or corroded parts and compartments, burrs or
sharp edges and scratched finish (see 4.6.2).
4. VERIFICATION
4.1 Classification of inspections. The inspection requirements specified herein are
classified as follows:
a. First article inspection (see 4.2).
b. Conformance inspections (CI) (see 4.5).
4.2 First article inspection. First article inspections shall be performed on preproduction
and initial production samples as specified herein. Approval of the first article sample by the
Government shall not relieve the contractor of the obligation to supply hydraulic power units that
are fully representative of those inspected as a first article sample. Any changes or deviation of
the production units from the first article sample shall be subject to the approval of the contracting
officer.
4.2.1 Preproduction inspection (PPI). Unless otherwise specified (see 6.2), the
preproduction inspection sample shall consist of two power units. The sample units shall be
subjected to the PPIs specified in table I.
4.2.2 Initial production inspection (IPI). Unless otherwise specified (see 6.2), the initial
production sample shall consist of three power units randomly selected from the first production
lot manufactured. The sample units shall be subjected to the IPIs specified in table I.
4.3 Inspection conditions. Unless otherwise specified (see 6.2), all inspections shall be
conducted under the following conditions:
Air temperature: 73 +18°F.
a.
b.
Barometric pressure: 28.5 (+2, - 3) inches Hg of mercury.
c.
Relative humidity: 35 +5 percent.
d.
Voltage: 27.5 +0.5 Vdc.
9
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business