A-A-53495
Impact test. The pump shall be dropped once in each of the following positions from a height of 4 feet onto a concrete surface:
a. With the longitudinal axis of the pump parallel to the concrete surface and with the plunger assembly in the “out” position.
b. With the longitudinal axis of the pump 45 degrees to the concrete surface and with the plunger assembly in the “out” position and toward the concrete surface.
c. With the longitudinal axis of the pump 90 degrees to the concrete surface and with the plunger assembly in the “in” position and the handle toward the concrete surface.
Upon completion of these drops, the pump shall be subjected to and pass the following:
1. Examination of pump.
2. Operating force test.
3. Pump leakage test.
Failure of any of these tests shall constitute a defect.
Contractor certification. The contractor shall certify that the product offered meets the salient characteristics of this description and conforms to the producers’ own drawings, specifications, standards, and quality assurance practices. The Government reserves the right to require proof of such conformance prior to first delivery and thereafter as may be otherwise provided for under the provisions of the contract.
Regulatory requirements.
Federal Food, Drug and Cosmetic Act. If the product covered by this document has been determined by the U.S. Food and Drug Administration to be under its jurisdiction, the offeror/contractor shall comply, and be responsible for compliance by its subcontractors/suppliers, with the requirements of Federal Food, Drug and Cosmetic Act, as amended, and regulations promulgated thereunder. In addition, the offeror/contractor shall comply, and be responsible for compliance by its subcontractors/suppliers, with the requirements of all other applicable Federal, State, and local statutes, ordinances, and regulations.
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business